Case study

Rapid Response Temporary Mast Deployment – Vodafone 29103 Elderslie Golf Club

The Challenge

When an unexpected network outage disrupted service in a high-demand area, the challenge was clear: restore coverage fast.

The Solution

The solution required an end-to-end approach—acquisition, design, and deployment—executed under tight timescales without compromising safety or compli…
The solution required an end-to-end approach—acquisition, design, and deployment—executed under tight timescales without compromising safety or compliance. The first step was securing a site. Thanks to strong, established relationships with trusted site providers, we were able to negotiate immediate access and short-term agreements. This collaboration ensured approvals were streamlined and operational readiness was achieved quickly. Design and engineering commenced immediately. Our team conducted surveys and structural assessments, leveraging pre-approved modular mast designs to accelerate timelines. Power and backhaul connectivity were coordinated in parallel, ensuring the site was ready for integration as soon as the mast was erected. Deployment was executed through a fast-track process. Specialist teams mobilised quickly, completing foundation works, mast installation, and equipment installation within the timescales provided. Despite the urgency, rigorous safety checks were maintained throughout, reflecting our commitment to quality and compliance.

The Results

The results from an end-to-end process approach ensured the temporary mast was fully operational, restoring coverage for users within the area within timescale. The project delivered cost efficiency and reliability, earning positive feedback from bot…
The results from an end-to-end process approach ensured the temporary mast was fully operational, restoring coverage for users within the area within timescale. The project delivered cost efficiency and reliability, earning positive feedback from both the client and end-users. A key success factor was the close partnership with the site provider. Their flexibility and trust enabled immediate access and collaborative problem-solving, demonstrating the power of strong relationships in achieving exceptional outcomes under challenging circumstances.

Featured Case Studies

Glastonbury Festival

Learn more

Design and Engineering

Learn more

Ready to Elevate Your Connectivity

Contact us to discuss your project requirements

Logo White
Logo Graphic

Contact us

3 Bath Mews, Bath Parade
Cheltenham, Gloucestershire
England, GL53 7HL
enquiries@x-celltelecom.co.uk
01242 786186

  • Home
  • About
  • Projects
  • Services
  • Case Studies
  • Contact

Latest news

LinkedIn
SafeContractor Approved Certification Seal Cyber Essentials Certification British Assessment Bureau and UKAS Management Systems accreditation mark ISO 14001 Environmental Management Certification ISO 45001 Occupational Health and Safety Certification
  • Privacy Policy
  • Terms and Conditions

Copyright © 2026 · X-Cell Telecom Ltd